TY - GEN
T1 - Analysis of source separation algorithms in industrial acoustic environments
AU - Lozano, Clevis
AU - Gómez, Andrés
AU - Chacón-Rodríguez, Alfonso
AU - Merchán, Fernando
AU - Julian, Pedro
N1 - Publisher Copyright:
© 2015 IEEE.
PY - 2015/9/9
Y1 - 2015/9/9
N2 - This paper shows the results from the computation cost evaluation of three blind source separation algorithms. The algorithms tested were: FastICA, Adaptive Algorithm Based on Natural Gradient, and Adaptive EASI Based on Relative Gradient. The algorithms were chosen for their relative simplicity, and taking into account their hardware implementation feasibility, either on a FPGA or an ASIC, as part of a system for acoustic localization of mobile agents in industrial environments.
AB - This paper shows the results from the computation cost evaluation of three blind source separation algorithms. The algorithms tested were: FastICA, Adaptive Algorithm Based on Natural Gradient, and Adaptive EASI Based on Relative Gradient. The algorithms were chosen for their relative simplicity, and taking into account their hardware implementation feasibility, either on a FPGA or an ASIC, as part of a system for acoustic localization of mobile agents in industrial environments.
KW - acoustic localization
KW - Adaptive Algorithm Based on Natural Gradient
KW - Adaptive EASI Based on Relative Gradient
KW - Blind Source Separation (BSS)
KW - FastICA
KW - FPGA
UR - http://www.scopus.com/inward/record.url?scp=84945156117&partnerID=8YFLogxK
U2 - 10.1109/LASCAS.2015.7250482
DO - 10.1109/LASCAS.2015.7250482
M3 - Contribución a la conferencia
AN - SCOPUS:84945156117
T3 - 2015 IEEE 6th Latin American Symposium on Circuits and Systems, LASCAS 2015 - Conference Proceedings
BT - 2015 IEEE 6th Latin American Symposium on Circuits and Systems, LASCAS 2015 - Conference Proceedings
A2 - Arnaud, Alfredo
A2 - Silveira, Fernando
A2 - Garcia, Lorena
PB - Institute of Electrical and Electronics Engineers Inc.
T2 - 6th IEEE Latin American Symposium on Circuits and Systems, LASCAS 2015
Y2 - 24 February 2015 through 27 February 2015
ER -